Field test: PV Modules

A real world comparison between Mono, Poly, PERC and Dual PV Modules.

Total solar yield: --
S
Total solar yield: --
S
Total solar yield: --
S
Total solar yield: --
S
Total solar yield: --
E
Total solar yield: --
W
Romania
--
--
Installation date: 09-03-2020
--
--
--
--
--
--
--
Irradiance

* This is a field test and the results are specific for this installation on this location please research which is the best solution for your own situation as the results can be different based on environmental influences.

Total solar yield as of 27/03/2023 when the results were reset:
Mono: 9158 kWh
Split-cell: 9511 kWh
Poly: 9113 kWh
Perc: 9471 kWh
Perc-east: 1970 kWh
Perc-west: 1730 kWh

VE Power Setup: Version 2.0 released

Version 2.0 of VE Power Setup is now released and will automatically update, when you use the software. VE Power Setup is utilized as described in the headline image above. It can be downloaded from our Software Page.

Changes

– Improved error messages. For example, when trying to upload firmware for an MPPT 75/50 into a 150/35, the error message gives clear details of the problem, instead of something incomprehensible such as ‘Unknown DUP error occurred (exit code 33)’.

– Fixed bug. Loading VE.direct firmwares from network paths now works properly.

– Updated the ‘Need help connecting’ information.

– Updating the firmware of VE.Direct products takes a little longer, but as a consequence the process is now more stable.

If you have any questions, please don’t hesitate to ask in the comments below.

John Rushworth

 

 

Avatar of John Rushworth
Previous
VRM Portal updates: Alarms and automatic monitoring
Next
MultiCompacts improved: faster switching to grid

Related blogs