This quick installation guide lists all the steps that are needed to install and configure a Victron Energy ESS system. It briefly explains each step. It also provides links to locations where more in depth information about each step can be found.
The full ESS manual can be found here: design-installation-manual
Familiarize yourself with the Victron Energy ESS system.
A good place to start is to watch this video:
There are a few different ways to set an ESS system up. A combination of these are possible as well:
See below drawings to get an idea of all possibilities. The first drawing shows the wiring when a MultiPlus-II is used; and the second one shows how it is wired with a MultiPlus or Quattro.
Both drawings show all AC- and DC-Coupled combinations.
Please see below lists. links are provided to the relevant equipment product pages
You will need:
Note: This information does not apply to the Multi RS models, which use a VE.Can interface (not VE.Bus) see the RS product manuals for specific information on programming them for ESS.
For a DC coupled ESS you will also need:
For an AC coupled ESS you will also need:
If the ESS needs an energy meter, you will need:
And one or more of the Energy Meter accessories:
To measure PV power coming from a grid-tie PV inverter of a type other than Fronius, SMA, ABB or Solar Edge, you will need one of these:
To equip the system with WiFi you will need:
In case of a smart battery such as BYD, you might need:
To find the applicable installation manuals see the links in the prevision steps. These links will direct you to the relevant product section. Then click on a the applicable product. On the product page scroll down to “Downloads”, and then select “manuals” from the drop down box.
The easiest way is to let the GX device (Cerbo GX) do an automatic update. This can be selected from its menu, once it is connected to the internet. Alternatively update via a SD card. For instructions how to update see: How to update a GX device
Use VictronConnect; instructions are in the VictronConnect manual, section Firmware updates.
(skip this step if only a single inverter/charger is used)
If the ESS system contains multiple inverter/chargers, they first will need to be set up to run in parallel and/or 3 phase.
For instructions on how to do that see this manual: Parallel, split- and three-phase VE.Bus systems
The inverter needs to be configured
See this video on how to use VE.Configure:
The following settings are important:
For details, see the relevant section in the ESS Design and installation manual.
For details, see the relevant section in the ESS Design and installation manual.
For more information, refer to the VRM Portal documentation.