actor_offgrid
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
actor_offgrid [2019-06-11 15:38] – lucian | actor_offgrid [2023-10-25 15:36] (current) – bob | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
- | For an Off-Grid system. when the batteries are full and we still have PV power available, that power is lost. We could use that power and send it to a boiler or something similar. For this we are using a device from My PV called AC-Thor. | + | For an Off-Grid system. when the batteries are full and we still have AC coupled |
- | The schematic for this kind of system looks like this (the meter from MyPv is not needed in this setup): | + | The schematic for this kind of system looks like this (the meter from my-PV is not needed in this setup): |
{{:: | {{:: | ||
Line 9: | Line 9: | ||
First setup: | First setup: | ||
- | Ac-Thor device must be connected on the AC output of the Multi/ | + | AC-Thor device must be connected on the AC output of the Multi/ |
Line 31: | Line 31: | ||
{{:: | {{:: | ||
- | On the Multiplus or Quattro, using Ve.config, add the PV Inverter support Assistant | + | On the Multiplus or Quattro, using Ve.config, add the PV Inverter support Assistant. |
+ | |||
+ | -> The correct working of the frequency shift in the PV Inverter assistant needs to physically have a PV inverter installed on ACout which can feed into the Victron system. | ||
actor_offgrid.1560260280.txt.gz · Last modified: 2019-06-11 15:38 by lucian