6. Lynx Class-T Power In commissioning
In this section:
Commissioning sequence:
Check the polarity of all DC cables. | |
Check the cross-sectional area of all DC cables. | |
Check if all cable lugs have been crimped correctly. | |
Check if all cable connections are tight (don’t exceed maximum torque). |