7. Commissioning the Lynx Distributor

In this section:

Commissioning sequence:

checkbox.svg

Check polarity of all DC cables. Check cross sectional area of all DC cables.

checkbox.svg

Check if all cable lugs have been crimped correctly.

checkbox.svg

Check if all cable connections are tight (don’t exceed maximum torque).

checkbox.svg

Tug slightly on each battery cable to check if the connections are tight and if the cable lugs have been crimped correctly.

checkbox.svg

Check if the fuses have been placed and their connections are tight (don’t exceed maximum torque).

checkbox.svg

Check if the fuse names of the Lynx Distributor (if applicable) are correctly named